As with any asphalt shingling job i install a 9 in.
Roofing shingles how to install valleys.
I overlap the inside corner of the drip edge at the valley to minimize sharp edges that could cut into the wsu over time.
These strips go under the drip edge.
Strip of wsu along the eaves edges and i crosslap the strips at the valley.
Ensure ice and water protector has been installed along the valley first.
The open woven and closed cut methods are demonstrated.
Where possible install three tab shingles so that the tabs falling over metal valleys or rake edges at the side of the house are at least four inches wide.
With underlayment and flashing installed apply shingles up to one side of the flashing.
Complete the application of underlayment and valley flashing before the roofing shingles are applied.
To shingle out of the valley with laminated shingles lay a shingle down as a gauge and mark the corner at the bottom left and top right of the roof.
Closed valleys are completed during shingle installation.
Do not drive nails into the flashing.
I then move the shingle to the uppermost course on the roof plane line up the mark on the shingle with the valley center and again mark the corner.
Only nail at the edges with only enough nails to.
Valleys are a prime leak area so it s important to be careful.
For better results try to use full size shingles going into a closed valley one without metal flashing as this can eliminate nailing too close to the centerline.
Then starting at the base of the.
To secure the roof valley flashing nail it down carefully.